CxA Services, LLC

LCMH 9th Fl ICU

The construction project consists of the renovation to the 9th floor to house a 16 Bed Medical Intense Care Patient area.  Two new AHU’s and a new air cooled chiller are being added.  The mechanical design includes interconnection with the central plant for redundancy needs.   Commissioning Services being provided for this project include the HVAC systems, associated DDC controls verification and test & Balance verification.        



​Completion Date: 2014 

​​​LCMH OR 12 & 14 Expansion

The construction project consisted of a renovation to the 3rd floor to house two new state of the art surgical rooms.  The mechanical equipment included a new AHU unit for these rooms and the rebalancing of the outside air unit dedicated for the Surgery Suite.  Commissioning Services provided included the HVAC systems, associated DDC controls verification and test & balance verification.  

Completion Date: 2014 

Completion Date: 2015 

LCMH 2nd Floor Dialysis

The construction project consisted of a renovation to the 2nd floor Dialysis area. The mechanical equipment included a new AHU, eight new room reheat coils, and associated DDC controls. Commissioning services provide for this project included the HVAC systems, DDC controls verification, and test & balance verification.

Completion Date: 2014 

LCMH MRI Suite


The construction project consisted of a renovation to house a new MRI Suite in the MOB2 at Lake Charles Memorial Hospital. The mechanical equipment included a new CRAC, steam humidifiers, exhaust fan, VAV boxes, and associated DDC controls. Commissioning services provide for this project included the HVAC systems, DDC controls verification, and test & balance verification.

Lake Charles Memorial Hospital

Lake Charles, Louisiana

Completion Date: 2016

Completion Date: 2015 

LCMH Nelson Road MOB

The new construction project consisted of an off campus, two story, Medical Office Building. The mechanical equipment included three new d/x AHU’s, three new d/x condensing units, VAV boxes, and associated DDC controls. Commissioning services provide for this project included the HVAC systems, DDC controls verification, and test & balance verification.

Completion Date: 2016

Completion Date: 2016

Completion Date: 2016

LCMH 6th Floor PICU

The construction project consisted of a renovation to the 6th floor PICU area. The mechanical equipment included a new AHU, six new room reheat coils, and associated DDC controls. Commissioning services provide for this project included the HVAC systems, DDC controls verification, and test & balance verification.

LCMH Glycol Chiller Women’s Hospital

The commissioning process for this project started in the construction phase. The project consisted of a new chiller to be installed for the surgery suite AHU, to lower evaporator coil temperature and achieve better control of humidity in surgery suites. The mechanical equipment included a new rooftop glycol chiller, and associated controls. Commissioning services provided included HVAC systems, DDC controls verification, and test & balance verification.Type your paragraph here.

Completion Date: 2016

LCMH ER Dept Expansion & Renovation

The commissioning process for this multi-phase project started in the Construction Phase with the Phase 1A scope which was a renovation project of existing space which was completed in in 2014.  The construction project continues with Phases 2 thru 4 which consists of renovation, as well as a new addition to the ER Suite.  Commissioning Services provided for this project includes the HVAC systems, associated DDC controls verification and test & Balance verification.   

LCMH 2nd Floor BioMed

The commissioning process for this project started in the construction phase. The project consisted of a renovation to the 2nd floor BioMed area of the facility. The mechanical equipment included a new rooftop AHU, VAV boxes, and associated controls. Commissioning services provided included HVAC systems, DDC controls verification, and test & balance verification.

​LCMH 2nd Fl Rehab Unit

The commissioning process for this project started in the Construction Phase.  The construction project consisted of a renovation to the 2nd floor to house a twenty-bed rehabilitation patient area.  Commissioning Services provided for this project included the HVAC systems, associated DDC controls verification and test & Balance verification.