NOAA/NMFS SE Fisheries Facility

The original facility design was completed in 1964 and the construction completed in May 1966. Recommendations to upgrade and replace the existing chilled water piping system and replace approximately 70 fan coil units, one dedicated outside air unit and temperature controls on all three floor levels were contracted. The complete piping system and fan coils were commissioned for this project. Commissioning work also included verification of the controls, HVAC equipment operation, and test and balance verification.

Completion Date: 2012

Miami, FL